PERSONAL PARTICULARS

Name Angelo PAPOUTSAKIS

Date of Birth 22 October 1960

Place of Birth Sydney, Australia

Marital Status Married, 3 children Nationalities Greek and Australian


QUALIFICATIONS

Profession Architect

Education A. A. Sc., City University of New York, 1981 B. Arch., University of Sydney, 1988

Languages Greek, English

Computer Knowledge of MS- Windows Operating Environment.

Systems Expertise Working knowledge of many industry standard applications such as MS- Excel, MS-Word, AutoCAD R14, Unicad. Memberships Technical Chamber of Greece Association of Greek Architects


OVERVIEW

Angelo Papoutsakis has had extensive exposure to the practice of architecture through his studies in the U.S.A. and Australia and considerable professional experience in Australia, Greece and Germany. He has been involved in every aspect of architectural design, construction documentation, contract administration (including inspection of works) and liaison with public agencies through his experience on many complex building projects including an international airport, hotels, office buildings, a library, a school and residential work. Through his participation on two hotel resort projects in which Robinson Club GmbH were operational managers he has successfully integrated German requirements and procedures into Greek building practice in both cases in building complexes of outstanding architectural merit. Recently, as senior team member on the New Athens International Airport project, for which Hochtief AG is the Contractor, he had wide ranging responsibilities stemming from his engagement with the project from its initial stages and his consequent depth of knowledge of the issues involved in a building project of great complexity.

 


CRHONOLOGY

ACRHI+

March 1999- May 2000 Construction Documentation and supplementary Design of the retail units of the Main Terminal Building and the Satellite Building, New Athens International Airport. Project cost 3.3 million.DEM The client for this project was the German firm Lindner A.G. the main finishing subcontractor of the airport project, which, in addition to its main contract work of partitions, wall claddings and ceilings, was awarded the work relating to the retail unit shopfronts. The basis of the retail unit work was the preliminary design of the British interior design office of J.H.P. This design was further elaborated to take into account the requirements for seismic movement set out by Lindner’s client, the main contractor Hochtief; to adapt the design to incorporate Lindner’s standard components as far as possible and to resolve technical manufacturing problems unforeseen by J.H.P.’S designers. Mr. Papoutsakis was responsible for coordinating the design work with Lindner’s client, Hochtief, producing all relevant documentation for the design approval process, producing all working drawings necessary for the site, providing material take-offs for material procurement, inspecting and coordinating work of Lindner subcontractors and general site support for every aspect of the retail unit works.

With Doxiadis Associates, consultants on Development and Ekistics S.A.

Main Terminal Building, New Athens International Airport MTB total area 165000 sq.m., total project cost DEM 3.2 billion.

June 1996 – February 1999 Construction Documentation Phase Senior Architect member of the project team for the preparation of working drawings on site in Spata Greece. Responsible for coordinating the work of other team members and assuring the coordination and integration of incoming information from consultants, site and suppliers.

October 1995 – May 1996 Preliminary Design Phase Member of the project team for the preparation of the preliminary design in Essen, Germany. Member of the design team assigned with the development of the interior design scheme and the coordination of structural steel design. The New Athens International Airport contract was awarded by the Greek State to a consortium led by German contractor Hochtief AG as a design- build- finance- operate package. Doxiadis Associates involvement with the main terminal building has been as subcontractor to Hochtief for architectural services. Doxiadis Associates began work on the MTB in July 1996 and construction commenced four months later in November 1996 and is scheduled to finish in September 2000. The construction documentation phase of the project was to an extreme fast track schedule with regular drawing submissions. The scope of the project was truly international requiring the compliance with the IATA regulations, The Americans with Disabilities Act, the German building regulations (Landesbauordnung), German industrial standards (DIN) and the Greek Seismic code (structural) and also the incorporation of numerous outside consultants work. The Airport has a capacity of 16 million passengers per year. The MTB has a capacity of 6000 passengers/ peak hour. The building has 14 passenger boarding bridges, 148 check-in counters and extends over 4 main levels each of which covers 40000 sq.m..

With Nikos Valsamakis, Architect.

March 1991 – March 1995 New primary school for the Greek American Educational Foundation at Kanza near Athens. Total site area 185.000 sq.m. (also occupied by pre existing school). Total surface area 12.500 sq.m. construction cost GRD 2.1 billion. Responsibilities included preparation of construction drawings, construction detailing, passive fire protection scheme, tender documents, specifications and construction supervision. Coordinated structural and services design with independent engineering offices. Liaison with the project benefactor (the project was entirely funded by a grant from the Ioannis Latsis foundation).

January 1992 – March 1995 Complete renovation and refurbishment of tourist resort Robinson Club Lyttos Beach on the island of Crete. Total area of new work 2.000 sq.m.. Construction cost GRD 600 million. Member of the design team for all work involved. Responsible for documents for building approval from government authorities, working drawings, construction detailing, lighting design and inspection of works. Liaison with Robinson Club GmbH (Hannover) during all phases of design and construction to ensure conformity of all aspects with operational, functional and maintenance requirements of management.

1994 Library and convention centre for the Greek Medical Library Foundation in Athens (Andrianoupoleos st. Papagou). Total surface area 8.000 sq.m. Estimated cost of construction GRD 1.2 billion. Phase I of a larger scheme which will see the addition of multiple convention halls doubling the total area. Responsibilities included working drawings, construction detailing, passive fire protection scheme, specifications and tender documents.

- Member of the design team for participation in a closed architectural competition for the design of a 3 storey office building to house the new headquarters of the Greek Oil Refineries of Aspropirgos (EL.D.A.) at Aspropirgos near Athens. Total surface area 10.600 sq.m. Estimated cost of construction GRD 2.4 billion.

1993 Member of the design team for participation in a closed architectural competition for the design of an 8 storey office building in Athens (Tsocha and Bournazou st.) including underground parking for 210 cars for the brotherhood of Theologians “Zoe”. Total surface area 10.000 sq.m. Estimated cost of construction GRD 2.2 billion.

1992 Maintenance center, showroom and offices for TECHNOCAR S.A. in Athens (Karaiskaki str., Argiroupoli). Member of the design team and occasional inspection of works. Total surface area 6.200 sq.m. Construction cost GRD 1.4 billion.

July 1989 – March 1991 Robinson Club Daidalos tourist resort on the island of Kos. Total site area 218.200 sq.m. Total area of buildings 22.600 sq.m. Cost of project GRD 5.5 billion. Capacity of hotel 606 beds in 268 rooms arranged in 15 neighborhoods. Central facilities including lounges, conference center, 2 bars, buffet and dining room, child care center, theatre, shops, tavern, disco, main pools, reception and offices. Peripheral facilities include a health center; beach center with bar, tavern and watersports base; sports center with bar, 2 competition standard tennis courts, 10 other tennis courts, volleyball and basketball courts and archery court; funicular railway between the central facilities, on a plateau 60m above sea level, and the beach. Responsibilities included working drawings, construction detailing, lighting design and inspection of works. Coordinated structural and services design by independent engineering offices. Liaison with Robinson Club GmbH (Frankfurt) and close collaboration with Robinson Club’s departments during all phases of design and construction. Sourcing of items of interior decoration and fitout. This project was commissioned for design by the office of N. Valsamakis in mid-1988, by mid-1989 the preliminary design phase was competed, ground breaking commenced in December 1989 and the resort opened in April 1991. To expedite the speedy completion of the project an elementary fast track method of design and parallel construction was adopted. The resort was nominated in 1992 for the Mies Van der Rohe pavilion award for European Architecture.

1991 Member of the design team for the construction of a 5 storey office building with underground parking for 50 cars in Athens (Singrou Ave.) to house the headquarters of the Vasilakis Group of companies. Total surface area 7.250 sq.m. Estimated cost of construction GRD 1.5 billion.

1990 Member of the design team for participation in a closed architectural competition for the design of an 8-storey office building with underground parking for 100 cars in Athens (Amfitheas Ave.) to house the headquarters of the shipping company Mayamar Marine Enterprises S.A. Total surface area 16.000 sq.m. Estimated cost of construction GRD 3 billion.

With Donald Russell Wyllie, Architect

1989 Renovation to and new roof for Merrylands Returned Servicemen’s League club. Estimated cost of construction AUD. 1.500.000. Sketch design, preliminary inquiries with builders for costing purposes. Renovations and extension to Wentworth Park kindergarten for the Kindergarten Association of N.S.W. Construction cost AUD. 175.000. Responsible for inspection of works and contract administration. Liaison with local water board. Renovations and extension to Mant residence. Construction cost AUD. 55.000 Responsible for sketch design, approvals from local authorities, negotiations with builder (did not go to tender), inspection of works and contract administration. 1988 Housing scheme at Ettalong. Speculative development of shorefront townhouses for private client. Estimated construction cost AUD. 1.200.000. Responsible for project from sketch design stage to completion of construction drawings, tender documents, specifications. Royal North Shore Hospital kindergarten for the R.N.S.H. Construction cost AUD. 500.000 Responsible for inspection of works and contract administration. Wyllie Lodge old persons home. Construction cost AUD. 1.000.000 Construction details, construction supervision, contract administration. Extensions to the Carr residence Construction cost AUD. 350.000 Construction details, construction supervision, contract administration.

 


OTHER EXPERIENCE

1987 Worked as an undergraduate with the office of Ken Maher & Partners, Architects and Planners on the preparation of construction drawings for a public housing scheme and as a design assistant during the planning of an inner city redevelopment scheme.

1986 Worked as an undergraduate with the interior design office of Christine Pearson on various retail, commercial and domestic projects.


back to Acrhi+ home Page